Garbage, organic and recycling collection on National Patriots’ Day, May 18
May 14, 2020
The regular schedule will apply on Monday, May 18. Remember to place your bins curbside before 7 a.m. on collection day or after 7 p.m. the night... view
Mayor's Message: postponement of second payment of property taxes for 2020
March 20, 2020
I am reaching out to the community of Dollard-des-Ormeaux at this very challenging time to reassure you that the City is constantly monitoring the... view
-A A +A

Info-Work

This section contains information on current construction work in Dollard-des-Ormeaux as well as work planned for 2020. Dates may vary since several factors, such as the weather, can have an impact on the duration of the work.

All possible measures are taken to minimize inconveniences. The City asks residents to respect traffic signs near construction sites.

We thank all residents and motorists for their patience and cooperation!

Planned works
Reconstruction of the pavement, curbs and sidewalks
Rue
Street
Date
Status
June 8, 2020 to June 26, 2020
Work in progress
June 8, 2020 to June 26, 2020
Work in progress
June 22, 2020 to July 24, 2020
Work in progress
June 29, 2020 to September 11, 2020
Work in progress
Lining of water mains
Rue
Street
Date
Status
May 13, 2020 to June 30, 2020
Work in progress
May 13, 2020 to June 30, 2020
Work in progress
May 13, 2020 to June 30, 2020
Work in progress
May 13, 2020 to June 30, 2020
Work in progress
May 28, 2020 to August 7, 2020
Work in progress
May 28, 2020 to August 7, 2020
Work in progress
June 7, 2020 to August 28, 2020
Work in progress
June 7, 2020 to August 28, 2020
Work in progress
June 7, 2020 to August 28, 2020
Work in progress
June 29, 2020 to September 4, 2020
Work in progress
Flushing and inspection of fire hydrants
Rue
Street
Date
Status
July 6, 2020 to July 17, 2020
Planned
Reconstruction of Saint-Jean Boulevard
Rue
Street
Date
Status
May 21, 2020 to June 12, 2020
Completed
Conversion of the public lighting network to LED luminaires
Rue
Street
Date
Status
October 4, 2019 to June 15, 2020
Work in progress
Renovation of the play area at Coolbrooke Park
Rue
Street
Date
Status
October 28, 2019 to June 1, 2020
Work in progress
Replacement of water mains and reconstruction of the pavement, curbs and sidewalks
Rue
Street
Date
Status
June 15, 2020 to August 7, 2020
Work in progress
Lining of sewer mains
Rue
Street
Date
Status
To come...
Planned
Hydro-Québec - Construction of a concrete encasement to house electrical cables
Rue
Street
Date
Status
June 22, 2020 to July 31, 2020
Work in progress

If you live on one of these streets and have an automatic sprinkler system, a swimming pool backwash pipe or any other object buried at less than 3 meters (10 feet) from the curb or sidewalk, please advise Urban Planning and Engineering Department at 514-684-1010. Please take note that if the City has not been advised and damages do occur, the City cannot be held responsible.

If you would like to widen your driveway or change its location, please advise us as soon as possible.

For additional information

Urban Planning and Engineering Department
514-684-1010.