Night work on Saint-Jean Boulevard from November 24 to 26, 2018
November 23, 2018
Hydro-Québec will carry out night work on Saint-Jean Boulevard at the intersection of De Salaberry Boulevard from November 24 to 26 (Saturday to... view
Complete closure of a portion of the A40 between the A13 and St-Jean Boulevard on the weekend of November 3 to 4
October 25, 2018
The project office of the Réseau express métropolitain (REM) wishes to inform drivers of major work to be done on Highway 40 (A40), which will... view
Home > Citizen services > Info-Work
-A A +A

Info-Work

This section contains information on current construction work in Dollard-des-Ormeaux as well as work planned for spring and summer of 2018. Dates may vary since several factors, such as the weather, can have an impact on the duration of the work.

All possible measures are taken to minimize inconveniences. The City asks residents to respect traffic signs near construction sites.

We thank all residents and motorists for their patience and cooperation!

Planned works
Lining of water mains
Rue
Street
Date
Status
April 3, 2018 to May 25, 2018
Completed
April 3, 2018 to May 4, 2018
Completed
April 3, 2018 to May 4, 2018
Completed
April 16, 2018 to July 16, 2018
Completed
April 30, 2018 to July 16, 2018
Completed
May 7, 2018 to August 13, 2018
Completed
Flushing and inspection of fire hydrants
Rue
Street
Date
Status
July 3, 2018 to August 31, 2018
Completed
Diagnostic of the water main network by the inspection and analysis of fire hydrants
Rue
Street
Date
Status
September 3, 2018 to October 19, 2018
Completed
Reconstruction of Saint-Jean Boulevard
Rue
Street
Date
Status
June 11, 2018 to August 10, 2018
Completed
Conversion of the public lighting network to LED luminaires
Rue
Street
Date
Status
August 21, 2017 to June 15, 2018
Completed
Hydro-Québec work
Rue
Street
Date
Status
Construction bicycle path
Rue
Street
Date
Status
May 7, 2018 to June 15, 2018
Completed
Énergir work (natural gas)
Rue
Street
Date
Status
April 16, 2018 to June 8, 2018
Completed
May 7, 2018 to July 6, 2018
Completed
May 28, 2018 to July 6, 2018
Completed
June 18, 2018 to August 10, 2018
Completed

If you live on one of these streets and have an automatic sprinkler system, a swimming pool backwash pipe or any other object buried at less than 3 meters (10 feet) from the curb or sidewalk, please advise Urban Planning and Engineering Department at 514-684-1010. Please take note that if the City has not been advised and damages do occur, the City cannot be held responsible.

If you would like to widen your driveway or change its location, please advise us as soon as possible.

For additional information

Urban Planning and Engineering Department
514-684-1010.