News

April 6, 2020
To the communities celebrating Easter and Passover,I would like to offer my warmest wishes for a happy, safe and healthy Easter and Passover, to you... Lire la suite Read more
April 3, 2020
Our parks are a place to be active and enjoy nature. During this pandemic, our parks have been providing our residents with much needed peaceful... Lire la suite Read more
March 25, 2020
To residents living around parks,It is prohibited to congregate in parks and play on the equipment. Although many of us are following the directives... Lire la suite Read more
March 23, 2020
To the Seniors in our community,Your City is here to offer you support during this difficult period.Self isolation is the most effective way to... Lire la suite Read more
-A A +A

REM: Preparatory work near the future Des Sources station

Construction activities
As of February 25, 2020
Montréal (West Island)


Nature of the work

As part of the work for building the Réseau express métropolitain (REM), preparatory work consisting of tree cutting will be carried out to make way for the future Des Sources station located in Pointe-Claire.

The map below shows the area where tree cutting will take place:



Mitigation measures

  • The work will be carried out outside the nesting period (March 31 to August 15) to limit impacts on birds, their nests and eggs.
  • These activities will be overseen by environmental experts.
  • At-risk plant species and trees will be relocated as required.
  • Through a reforestation program, the same number of trees that were cut in temporary construction zones will be replanted, and an additional 10% will be planted in the municipal territory or borough where the trees were cut to make way for the project.
  • In addition, a total of 250,000 trees will be planted to offset the GHG emissions produced during the construction phase.