Info work

  • Info work
Share

Welcome to the page dedicated to the works of the City of Dollard-des-Ormeaux!

To keep you informed of current and future projects, we’ve created an interactive map and a detailed table of construction works in our territory. You’ll find all the information you need to plan your travels and better understand the impact of the works on our community.

We thank you for your patience and cooperation while we carry out these projects to improve our environment and infrastructure. The city is doing everything in its power to minimize inconvenience caused by the work, and invites residents to respect the signage installed near construction sites to ensure safety and smooth operations.

Construction
In progressIn progress
In progress
PlannedPlanned
Planned
DoneDone
Done
Aucun résultat à afficher

Titre

Date

Details of works

You will find below the information available concerning the works planned or in progress on the territory of the City of Dollard-des-Ormeaux. The dates indicated may vary due to weather conditions or other factors that may affect the execution of the work. Thank you for your understanding!

Addition of equipment
RueDateStatutPièce jointe
Westwood ParkFall 2026Planned
Construction of a sliding mound
RueDateStatutPièce jointe
Westwood ParkSeptember 2026 to November 2026Planned
Construction of an underground retention basin and walk path
RueDateStatutPièce jointe
Terry-Fox ParkSpring 2026
Construction of an underground stormwater retention basin
RueDateStatutPièce jointe
Tecumseh-Frontenac intersection From June 25th to August 21st 2026In progress
Construction of sidewalks
RueDateStatutPièce jointe
Davignon (West side of Brunswick Boulevard to Fountain)June 15 to July 17th 2026In progress
Fire hydrant flushing and inspection
RueDateStatutPièce jointe
CityMay 2026 to August 2026Planned
Gas network renewal by Énergir
RueDateStatutPièce jointe
HamletApril 20th to June 26thIn progress
Hydro-Québec work
RueDateStatutPièce jointe
Corner Boul. Saint-Jean and De SalaberryFrom April 1st 2026 to December 31st 2029In progress
Installation of bike-share stations (BIXI)
RueDateStatutPièce jointe
LakeJune 22nd to August 5th 2026In progress
Coolbrooke ParkJune 22nd to August 5th 2026In progress
Sunnybrooke ParkJune 22nd to August 5th 2026In progress
Terry-Fox ParkJune 22nd to August 5th 2026In progress
Westwood ParkJune 22nd to August 5th 2026In progress
Frederick-Wilson ParkJune 22nd to August 5th 2026In progress
Lake/De SalaberryJune 22nd to August 5th 2026In progress
Installation of LED lighting
RueDateStatutPièce jointe
Soccer field at Lake Road ParkSeptember 2026 to Novembre 2026Planned
Soccer field at Westminster ParkSeptembre 2026 to Novembre 2026Planned
Baseball field at Westminster ParkSeptember to November 2026Planned
Installation of playground equipement
RueDateStatutPièce jointe
Centennial ParkSummer 2026Planned
New pickleball courts
RueDateStatutPièce jointe
Sunnybrooke ParkSeptember 2026 to November 2026Planned
Park trail repair work
RueDateStatutPièce jointe
Lake ParkJune 15 to 19 2026Planned
Purchase and installation of an eco-friendly toilet
RueDateStatutPièce jointe
Teresa-Dellar ParkFall 2026Planned
Refection of tennis and pickleball courts
RueDateStatutPièce jointe
From May 29 to June 26, 2026In progress
Rehabilitation of pavement, curbs and sidewalks
RueDateStatutPièce jointe
De Salaberry Boulevard (Hastings to Devon)June 25th to July 10th 2026In progress
HamletFrom July to August 2026Planned
MalardJune 22nd to July 28th 2026In progress
RavelFrom July to August 2026Planned
Des Sources Boulevard (Roger-Pilon to De Salaberry Boulevard)June 15th to July 24th 2026In progress
Hyman (Des Sources boulevard to Spring Garden)June 25th to Septembre 30th 2026In progress
Saint-Jean Boulevard, between Labrosse Street and Saint-Jean Boulevard overpassMay 31 to August 14In progress
Félix-Leclerc Highway (40) Eastbound Service RoadMay 31 to August 14In progress
Sewer and water main replacement work
RueDateStatutPièce jointe
July to August 2026Planned
Sewer repair work
RueDateStatutPièce jointe
Fredmin street between Cedarcrest street and Anselme-Lavigne avenueJune 3Done
Water mains lining
RueDateStatutPièce jointe
AcadiaMay 25th to August 21st 2026In progress
BanffMay 25th to August 21st 2026In progress
BaysideMay 25th to August 21st 2026In progress
JolicoeurJuly 6th to August 21st 2026Planned
PoplarJuly 6th to August 21st 2026Planned
BiscayeJuly 6th to August 21st 2026Planned
MatignanMay 25th to August 21st 2026In progress
MiddletonMay 25th to August 21st 2026In progress
PinecrestMay 25th to August 21st 2026In progress

If you live on one of these streets and have an automatic sprinkler system, pool return pipe or any other item buried within 3 metres (10 feet) of the curb or sidewalk, please notify the Urban Planning and Engineering Department at 514 684-1010. Please note that if no notice has been received and damage is incurred during the work, the Town cannot be held responsible.

Also, please notify us as soon as possible if you wish to make any changes to your driveway (location or width).

Any questions ?

Contact the Urban Planning and Engineering Department at
514 684-1010.

Explore the city
with the new
interactive map

A real commitment to a sustainable future!