Davignon Street
June 15 to July 17, 2026
Sidewalk construction work will take place on a section of Davignon Street, between Brunswick Boulevard and Fountain Street. To ensure the safety of workers and road users, traffic will be reduced to a single lane for the duration of the work. A detour will be in place.
Sources Boulevard
June 17 to July 24, 2026
Milling and paving work, along with localized repairs to certain sidewalks and medians, will take place on Sources Boulevard (southbound only), between Roger-Pilon Street and De Salaberry Boulevard.
The bus-only lane will be closed. Southbound traffic may be reduced to a single lane between 9 a.m. and 3 p.m. during the work.
Tecumseh Street
June 25 to August 21, 2026
Construction of an underground stormwater retention basin will take place at the intersection of Tecumseh and Frontenac Streets.
Tecumseh Street, between Thornhill Street and Labrosse Avenue, will be completely closed to traffic. A detour will be in place.